Proposed Bridge Replacement Project in Lewistown Area

 

February 17, 2021



Lewistown — The Montana Department of Transportation (MDT) would like to announce and invite the public to comment on a proposal to replace ten structures along 24 miles of Highway 200, east of Lewistown, and one structure south of Grass Range on Highway 87.

Proposed work includes replacement of structures with new bridges and culverts. The purpose of the project is to replace aging and deteriorating structures in poor condition to ensure long-term safety for the traveling public.

Construction is tentatively planned for 2023-24 depending on completion of design and availability of funds....



For access to this article please sign in or subscribe.

 

Reader Comments(0)

 
 

Powered by ROAR Online Publication Software from Lions Light Corporation
© Copyright 2024

Rendered 03/02/2024 07:00